Industrial investment
Announcements to date are largely MoUs and proposals; the semiconductor SEZ is approved.
Source: PIB; ANI; The Statesman · Sep 2026
A future-ready greenfield smart city being developed around industrial growth, advanced manufacturing, strategic infrastructure and multimodal connectivity.
Dholera Special Investment Region (Dholera SIR) is described as India’s first greenfield smart city, planned over approximately 920 sq. km in Gujarat.
It is being developed by Dholera Industrial City Development Limited (DICDL) — a special-purpose vehicle of the Government of India and the Government of Gujarat — as a node of the Delhi–Mumbai Industrial Corridor (DMIC). The region is planned around industry, technology and advanced manufacturing, with smart infrastructure, planned urban development and multimodal connectivity.
Source: NICDC
Reference: Proposed Development Plan, dated 7 Feb 2021 (PDF)
A stage-by-stage overview. Not everything below is operational — each item shows where it actually stands.
Tata Electronics is building a 300 mm fab in partnership with PSMC of Taiwan.
66.166 ha notified for Tata Semiconductor Manufacturing on 9 April 2026. Read the story
ASML, Sumitomo Chemical, Sojitz–NRS, Kelington and Fujifilm have announced MoUs or collaborations — most are agreements to explore. Read the story
Dholera International Airport is under construction and not yet operational. Read the story
The Ahmedabad–Dholera Expressway was inaugurated on 31 March 2026. Read the story
Gujarat’s Data Centre Policy 2026–29 is notified; the L&T Vyoma campus is an MoU-stage proposal. Read the story
Adani and Embraer plan an E175 assembly line; a Dholera site was being finalised. Read the story
A HUDCO financing MoU has been signed; a UAE Letter of Intent on Dholera investment cooperation is at the proposal stage. Read the story
India’s emerging semiconductor and advanced-manufacturing hub.
Tata Electronics is building a 12-inch (300 mm) semiconductor fab in Dholera in partnership with Powerchip Semiconductor Manufacturing Corporation (PSMC) of Taiwan. Tata Electronics describes a planned total monthly capacity of 50,000 wafers for analog and logic chips on 28–110 nm technologies.
An ecosystem is forming around it. The Government notified a 66.166-hectare SEZ for Tata Semiconductor Manufacturing in April 2026. ASML and Tata Electronics signed an MoU in May 2026 covering lithography tools and solutions, training, supply-chain resilience and R&D infrastructure. On 18 September 2026 Tata Electronics announced collaborations with Sumitomo Chemical, Sojitz–NRS and Kelington, and Fujifilm India has signed an MoU to explore a semiconductor-materials base in Dholera.
The fab is under construction. Most partnerships are MoUs or collaborations to explore — they are not operating facilities.
NICDC identifies six priority sectors for the Dholera node.
Announcements so far include a proposed E175 aircraft assembly line (Adani–Embraer), a proposed semiconductor-materials facility (Fujifilm India) and proposed data-centre campuses. These are plans and proposals; they are shown with their stage in News & Updates.
Announcements to date are largely MoUs and proposals; the semiconductor SEZ is approved.
Source: PIB; ANI; The Statesman · Sep 2026
Gujarat’s Data Centre Policy 2026–29 names Dholera SIR as a focus hub; projects are proposals.
Source: ANI · Sep 2026
Dholera SIR is a designated node of the Delhi–Mumbai Industrial Corridor.
Source: NICDC · Sep 2026
Dholera’s connectivity is being built in several directions at once — each with its own stage.
Distances and travel times are deliberately not shown. Stages as of September 2026.
Dholera International Airport is a joint venture of the Airports Authority of India, the Government of Gujarat and NICDIT. It is not yet operational. In a review on 14 July 2026 the Civil Aviation Minister reported:
Source: PIB – Ministry of Civil Aviation · 14 Jul 2026

The 109 km access-controlled Ahmedabad–Dholera Expressway, built at a cost of over ₹5,100 crore, was inaugurated on 31 March 2026. NICDC also lists national-highway access for the region.
Source: PIB – Prime Minister’s Office
Read the storyThe expressway is open; the airport is still being built. Both matter for how Dholera connects to Ahmedabad and beyond — and they are at different stages today.
A greenfield port is a proposal; freight and corridor connectivity are described by NICDC as features of the region.
The January 2026 Letter of Intent between the Government of Gujarat and the UAE Ministry of Investment lists a greenfield port among areas envisioned. It is a proposal — not approved or under construction.
Source: PIB – Prime Minister’s Office · Sep 2026
The Western Dedicated Freight Corridor has been reported complete. Project-specific rail or freight links into Dholera are separate and are not covered here.
Source: NICDC; media reports on the Western DFC · Sep 2026
NICDC describes Dholera as the largest node under the Delhi–Mumbai Industrial Corridor, developed by DICDL, a special-purpose vehicle of the Government of India and the Government of Gujarat.
Source: NICDC · Sep 2026
Trunk infrastructure across the 22.54 sq. km activation area is described by NICDC as almost complete.
The 300 MW plant is commissioned. Further solar and grid capacity for the region is being developed in phases.
Source: Tata Power Renewables · Sep 2026
Water, treated-water and drainage networks form part of the trunk infrastructure across the activation area. Capacity and connection timelines vary by zone.
Source: NICDC · Sep 2026
Underground utilities, ICT ducts and a command-and-control approach are part of the planned smart-city infrastructure. Delivery is in stages.
Source: NICDC · Sep 2026
Figures from official sources and company announcements, each linked to its source. They describe the region — not any individual property.
Overall planned span of the Dholera Special Investment Region.
Official source · NICDC · Checked Sep 2026The first area being activated; NICDC describes it as almost completed, with trunk infrastructure in place.
Official source · NICDC · Checked Sep 2026Proposed investment listed for the Tata Semiconductor Manufacturing SEZ. Tata Electronics also cites approximately US$11 billion.
Official source · PIB – Ministry of Commerce & Industry · Checked Sep 2026Tata Electronics describes a planned total monthly capacity of 50,000 wafers for analog and logic chips.
Company announcement · Tata Electronics · Checked Sep 2026Area of the SEZ notified for Tata Semiconductor Manufacturing on 9 April 2026.
Official source · PIB – Ministry of Commerce & Industry · Checked Sep 2026Access-controlled expressway built at a cost of over ₹5,100 crore; inaugurated 31 March 2026.
Official source · PIB – Prime Minister’s Office · Checked Sep 2026Recent developments from official announcements and credible publications.

Chief Minister Bhupendra Patel reviewed industrial, urban and social infrastructure at Dholera SIR, including construction at the Tata Electronics semiconductor fab, and inspected social-infrastructure facilities in the activation area such as a 200-bed hospital, a school, a fire station, a guest house, a food court and a tent city. Officials said Dholera International Airport, where a calibration flight has landed, is being targeted for operation by the end of 2026.
Read more
DHL Group is reported to be planning its first dedicated semiconductor logistics warehouse in India at Dholera, near Tata Electronics' fab, offering specialised storage, inventory management and material handling for chip manufacturers and suppliers. The reported investment is about ₹50 crore, with operations targeted from August 2027, within DHL Group's wider plan to invest roughly €1 billion in India by 2030.
Read more
Tata Electronics announced a partnership with Singapore-based Ascendas Firstspace to develop a 363-acre vendor park near its Dholera semiconductor fab, intended to let international and domestic suppliers acquire plug-and-play sites close to the facility. The park is planned to be developed further as a Special Economic Zone.
Read moreDholera is developing around industry, infrastructure and connectivity that sit at different stages.
Knowing which is operational, which is under construction and which is still proposed is the starting point for understanding any property nearby — and each project still needs to be looked at on its own information.
Explore the selected properties DLD presents, or talk to us about a location or a project you are considering.