Why Dholera

Why Dholera?

A future-ready greenfield smart city being developed around industrial growth, advanced manufacturing, strategic infrastructure and multimodal connectivity.

The region

What is Dholera SIR?

Dholera Special Investment Region (Dholera SIR) is described as India’s first greenfield smart city, planned over approximately 920 sq. km in Gujarat.

It is being developed by Dholera Industrial City Development Limited (DICDL) — a special-purpose vehicle of the Government of India and the Government of Gujarat — as a node of the Delhi–Mumbai Industrial Corridor (DMIC). The region is planned around industry, technology and advanced manufacturing, with smart infrastructure, planned urban development and multimodal connectivity.

Source: NICDC

Reference: Proposed Development Plan, dated 7 Feb 2021 (PDF)
Proposed land-use plan of Dholera SIR showing planned zones
Proposed land-use plan of Dholera SIR — planned zoning, not what has been built. Image: Fulshang, via Wikimedia Commons (CC BY-SA 4.0).
Current picture

What’s Happening in Dholera SIR?

A stage-by-stage overview. Not everything below is operational — each item shows where it actually stands.

  • Semiconductor manufacturing

    Tata Electronics is building a 300 mm fab in partnership with PSMC of Taiwan.

    Under construction
  • Semiconductor SEZ

    66.166 ha notified for Tata Semiconductor Manufacturing on 9 April 2026. Read the story

    Approved
  • Ecosystem suppliers and partners

    ASML, Sumitomo Chemical, Sojitz–NRS, Kelington and Fujifilm have announced MoUs or collaborations — most are agreements to explore. Read the story

    Proposed
  • Airport

    Dholera International Airport is under construction and not yet operational. Read the story

    Under construction
  • Expressway

    The Ahmedabad–Dholera Expressway was inaugurated on 31 March 2026. Read the story

    Operational
  • Data-centre interest

    Gujarat’s Data Centre Policy 2026–29 is notified; the L&T Vyoma campus is an MoU-stage proposal. Read the story

    Proposed
  • Aerospace manufacturing

    Adani and Embraer plan an E175 assembly line; a Dholera site was being finalised. Read the story

    Proposed
  • Government initiatives

    A HUDCO financing MoU has been signed; a UAE Letter of Intent on Dholera investment cooperation is at the proposal stage. Read the story

    Planned
  • OperationalIn use today.
  • Under constructionPhysical works are under way.
  • ApprovedAn approval, notification or policy exists.
  • PlannedAgreed and scheduled, works not yet started.
  • ProposedAn MoU, letter of intent or announced intent.
Semiconductor ecosystem

From Smart City to Semiconductor Hub

India’s emerging semiconductor and advanced-manufacturing hub.

Tata Electronics is building a 12-inch (300 mm) semiconductor fab in Dholera in partnership with Powerchip Semiconductor Manufacturing Corporation (PSMC) of Taiwan. Tata Electronics describes a planned total monthly capacity of 50,000 wafers for analog and logic chips on 28–110 nm technologies.

An ecosystem is forming around it. The Government notified a 66.166-hectare SEZ for Tata Semiconductor Manufacturing in April 2026. ASML and Tata Electronics signed an MoU in May 2026 covering lithography tools and solutions, training, supply-chain resilience and R&D infrastructure. On 18 September 2026 Tata Electronics announced collaborations with Sumitomo Chemical, Sojitz–NRS and Kelington, and Fujifilm India has signed an MoU to explore a semiconductor-materials base in Dholera.

The fab is under construction. Most partnerships are MoUs or collaborations to explore — they are not operating facilities.

Industrial development

Industries the region is planned around

NICDC identifies six priority sectors for the Dholera node.

  • Semiconductors
  • Aerospace & Defence
  • Solar component manufacturing
  • Green hydrogen
  • Pharmaceuticals & biotechnology
  • Heavy engineering

Announcements so far include a proposed E175 aircraft assembly line (Adani–Embraer), a proposed semiconductor-materials facility (Fujifilm India) and proposed data-centre campuses. These are plans and proposals; they are shown with their stage in News & Updates.

Proposed

Industrial investment

Announcements to date are largely MoUs and proposals; the semiconductor SEZ is approved.

Source: PIB; ANI; The Statesman · Sep 2026

Proposed

Technology & advanced manufacturing

Gujarat’s Data Centre Policy 2026–29 names Dholera SIR as a focus hub; projects are proposals.

Source: ANI · Sep 2026

Approved

DMIC connection

Dholera SIR is a designated node of the Delhi–Mumbai Industrial Corridor.

Source: NICDC · Sep 2026

Connectivity

360° Connectivity

Dholera’s connectivity is being built in several directions at once — each with its own stage.

Dholera SIR~920 sq. km · DMIC node
AhmedabadRegional hubRegional hub
Ahmedabad–Dholera ExpresswayInaugurated 31 Mar 2026Operational
Dholera International AirportNot yet operationalUnder construction
Ports & maritimeGreenfield port envisionedProposed
DMIC & industrial corridorsDesignated DMIC nodeApproved
Freight & logisticsDedicated Freight Corridor networkOperational
Regional road networkNational-highway accessOperational

Distances and travel times are deliberately not shown. Stages as of September 2026.

Air & road

Airport & Expressway

Airport Under construction

Dholera International Airport is a joint venture of the Airports Authority of India, the Government of Gujarat and NICDIT. It is not yet operational. In a review on 14 July 2026 the Civil Aviation Minister reported:

  • About 80% of overall construction reported complete
  • Runway, taxiway and ATC tower reported at 100%; terminal building about 75%
  • 25,000 sq. m passenger terminal, with a capacity of 2 million passengers a year
  • 2,500 sq. m cargo terminal being built
  • DGCA licensing under way — the ministry’s stated aim is operations around September–October, a target rather than a confirmed date

Source: PIB – Ministry of Civil Aviation · 14 Jul 2026

The Dholera International Airport site, including its approach road, photographed during a DLD site visit
The airport site and approach road. Photo: Dream Land Dholera, site visit, September 2026 — a general view, not the specific construction stage reported by the Ministry above. See the official photo and source

Expressway Operational

The 109 km access-controlled Ahmedabad–Dholera Expressway, built at a cost of over ₹5,100 crore, was inaugurated on 31 March 2026. NICDC also lists national-highway access for the region.

Source: PIB – Prime Minister’s Office

Read the story
Reading the stages

The expressway is open; the airport is still being built. Both matter for how Dholera connects to Ahmedabad and beyond — and they are at different stages today.

Ports, freight & corridors

Ports & Logistics

A greenfield port is a proposal; freight and corridor connectivity are described by NICDC as features of the region.

Proposed

Port & maritime connectivity

The January 2026 Letter of Intent between the Government of Gujarat and the UAE Ministry of Investment lists a greenfield port among areas envisioned. It is a proposal — not approved or under construction.

Source: PIB – Prime Minister’s Office · Sep 2026

Operational

Freight & logistics

The Western Dedicated Freight Corridor has been reported complete. Project-specific rail or freight links into Dholera are separate and are not covered here.

Source: NICDC; media reports on the Western DFC · Sep 2026

Approved

DMIC connection

NICDC describes Dholera as the largest node under the Delhi–Mumbai Industrial Corridor, developed by DICDL, a special-purpose vehicle of the Government of India and the Government of Gujarat.

Source: NICDC · Sep 2026

Smart infrastructure

Smart Infrastructure

Trunk infrastructure across the 22.54 sq. km activation area is described by NICDC as almost complete.

Operational

Power infrastructure

The 300 MW plant is commissioned. Further solar and grid capacity for the region is being developed in phases.

Source: Tata Power Renewables · Sep 2026

Under construction

Water infrastructure

Water, treated-water and drainage networks form part of the trunk infrastructure across the activation area. Capacity and connection timelines vary by zone.

Source: NICDC · Sep 2026

Under construction

Smart-city infrastructure

Underground utilities, ICT ducts and a command-and-control approach are part of the planned smart-city infrastructure. Delivery is in stages.

Source: NICDC · Sep 2026

Sourced figures

Dholera in Verified Numbers

Figures from official sources and company announcements, each linked to its source. They describe the region — not any individual property.

~920 sq. kmPlanned area of Dholera SIR

Overall planned span of the Dholera Special Investment Region.

Official source · NICDC · Checked Sep 2026
22.54 sq. kmActivation area

The first area being activated; NICDC describes it as almost completed, with trunk infrastructure in place.

Official source · NICDC · Checked Sep 2026
₹91,000 croreTata semiconductor fab — planned investment

Proposed investment listed for the Tata Semiconductor Manufacturing SEZ. Tata Electronics also cites approximately US$11 billion.

Official source · PIB – Ministry of Commerce & Industry · Checked Sep 2026
50,000Wafers per month — planned fab capacity

Tata Electronics describes a planned total monthly capacity of 50,000 wafers for analog and logic chips.

Company announcement · Tata Electronics · Checked Sep 2026
66.166 haSemiconductor SEZ area

Area of the SEZ notified for Tata Semiconductor Manufacturing on 9 April 2026.

Official source · PIB – Ministry of Commerce & Industry · Checked Sep 2026
109 kmAhmedabad–Dholera Expressway

Access-controlled expressway built at a cost of over ₹5,100 crore; inaugurated 31 March 2026.

Official source · PIB – Prime Minister’s Office · Checked Sep 2026
News & Updates

Latest Dholera News

Recent developments from official announcements and credible publications.

Aerial view of the access road and construction works near Dholera International AirportSmart City

IANS

Gujarat Chief Minister Reviews Dholera SIR Development, Airport Targeted for Year-End Launch

Chief Minister Bhupendra Patel reviewed industrial, urban and social infrastructure at Dholera SIR, including construction at the Tata Electronics semiconductor fab, and inspected social-infrastructure facilities in the activation area such as a 200-bed hospital, a school, a fire station, a guest house, a food court and a tent city. Officials said Dholera International Airport, where a calibration flight has landed, is being targeted for operation by the end of 2026.

Read more
Aerial view of ongoing industrial construction in the Dholera SIR fab areaLogistics

Electronics For You

DHL Plans a Dedicated Semiconductor Logistics Facility Near the Dholera Fab

DHL Group is reported to be planning its first dedicated semiconductor logistics warehouse in India at Dholera, near Tata Electronics' fab, offering specialised storage, inventory management and material handling for chip manufacturers and suppliers. The reported investment is about ₹50 crore, with operations targeted from August 2027, within DHL Group's wider plan to invest roughly €1 billion in India by 2030.

Read more
Putting it together

What this means for the region

Dholera is developing around industry, infrastructure and connectivity that sit at different stages.

Knowing which is operational, which is under construction and which is still proposed is the starting point for understanding any property nearby — and each project still needs to be looked at on its own information.